By Hexagon | Leica Geosystems

ROAD PRODUCTION

Passes saved using
with Machine control

$
13,200
$

PRODUCTIVITY INCREASE

0%

PRODUCTION SAVINGS PER MILE

0
$

MATERIAL

$

MATERIAL SAVINGS PER MILE

5,011
$

GRADE STAKING

STAKE REDUCTION WITH
MACHINE CONTROL

$

COST SAVING FOR GRADE STAKES

2,816
$
3,520
$

BLUE TOPPING

BLUE TOP REDUCTION
WITH MACHINE CONTROL

$

COST SAVING FOR BLUE TOPS

6,970
$
7,040
$

SUMMARY

MACHINE CONTROL PAYBACK

PRODUCTION

$
0.00

MATERIAL

$
5,011.00

STAKING

$
2,816.00

TOPPING

$
6,970.00

SAVINGS

PER

MILE

$
14,797.00

MACHINE CONTROL
SYSTEM COST

$
4.39

PAY BACK IN MILES

Earnings after payoff

MILES PER YEAR

221,955.00
$

PAY BACK IN MILES

WordPress Lightbox